Role of strategic planning in project
management in Kenya: A case of Constituency Development Fund (CDF)
projects in Kakamega County, Kenya |
|
| |
| |
|
Ramadhan Makokha Barasa1*, Mustafa Barasa2
and Prof. Christopher Gakuu1 |
|
|
1Department of Extra
Mural Studies, University of Nairobi, Nairobi, Kenya
2School of Public Health Biomedical Sciences and
Technology (SPHBST), Masinde Muliro University of Science and
Technology (MMUST), Kakamega, Kenya
*Corresponding Author’s Email:
mustrech@yahoo.com
Accepted December 02, 2015 |
|
|
Abstract |
|
|
The objective of
this study was to determine the role of strategic planning as a
monitoring and evaluation tool in the management of projects.
The study was carried out in Kakamega County which has 12
constituencies. Four constituencies were randomly sampled, from
where five (5) CDF funded projects were purposively identified
from each of the constituencies. Large projects that were
targeted to cost over one million Kenya shillings were
considered for sampling. Five committee members from each of the
CDF projects (including chairmen and heads of institutions) were
purposively sampled. Other respondents were purposively sampled
from Ministries of works and health, community leaders and other
stakeholders. Consequently, a total of 120 respondents were
targeted out of which 106 respondents availed the data which
were collected using questionnaires, document analysis,
checklists and interview schedules. Data was analysed both
descriptively and inferentially, using of SPSS and Microsoft
Excel 2013® suites. Findings indicated that strategic plans were
very crucial components of project management. The study
concluded that there is need to incorporate strategic plans in
project management. Respondents expressed that good strategic
plans should be worked out and adhered to during project
implementation and completion. Formulation of strategic plans
should therefore be spearheaded by constituency stake holders.
This study’s outcomes show that those charged with the
responsibility of carrying out project monitoring and evaluation
(M and E) should be empowered with appropriate knowledge and
skills for effective utilization of this tool.
Key words: Budget, Evaluation, Harambee and CDF, Logical
framework, Monitoring, Project development, Stakeholders